2026-MPW-171 - Bridge #PRT27195-E Foothills Trail / Ski Park (Forested Drainage)
This contract provides improvement to the Foothills Trail by the replacement of the Pierce County Parks bridge #PRT27195-E with a 200-foot long, two span, precast concrete girder bridge. The work also includes the clearing, grubbing, grading, replanting, and construction of a mitigation channel connecting the unnamed stream to a wetland in the area adjacent to the bridge. The work also includes traffic control, erosion control, and other work in accordance with and as described in the Plans and Specifications.
Bid Opening Time and Date: 1:00 P.M., WEDNESDAY, AUGUST 26, 2026
Bids received after 1:00 p.m. on this date will not be considered. Each Proposal (including all required attachments) shall be submitted to Pierce County by one of the following methods:
1. Electronically upload Bid Documents via https://www.piercecountywa.gov/CurrentSolicitations.
Instructions for submitting Bid Documents are located under "Project Details". This is the preferred method.
2. Deliver hard copy Bid Documents in a sealed envelope with the Project Name and Project Number as stated in the Call for Bids clearly marked on the outside of the envelope, or as otherwise required in the Bid Documents to ensure proper handling and delivery. Deliver to:
Pierce County
Finance Procurement Office
1501 Market Street, Suite 420
Tacoma, WA 98402
Proposals will be opened and publicly read via webcast 30 minutes after the time indicated above unless the Bid Opening has been delayed or canceled. The link for the webcast will be posted on Pierce County's website at http://www.piercecountywa.gov/CurrentSolicitations prior to the bid opening.
IPL0363507
Aug 7 2026