ClassifiedsMarketplace
Logo
  • Classifieds
  • Contact Us
  • Sign In
  • Register
  • Place Ad
    • Obituary
    • Legal
    • Recruitment
    • Classified
    • Celebration
    • Retail

  1. Home
  2. Legals
  3. Legals & Public Notices

LEGAL NOTICE Name of Project: Fife High School Safety and Security Upgrades 2026 5616 20th St E Fife, WA 98424 Owner: Fife Public Schools 1720 Oak Street Milton, WA 98354 Telephone: (253) 517-1000 Architect: Greene Gasaway 31620 23rd Ave S, Suite 207 Federal Way, WA 98003 Contact: Calvin Gasaway Telephone: (206) 818-5466 Description of Work: Work may be generally described as: 1. CCTV, access control and gates upgrades at Fife High School. Work includes but is not limited to: 1. Demolition, salvage, and cutting and patching. 2. Abatement. 3. Sealants and paint. 4. Door hardware. 5. Line voltage power and low-voltage connections, telecommunications. 6. Network installation, access control, and CCTV installation. 7. Concrete walks, gates and fencing. 8. Landscaping restoration. Pre-Bid Conference: A pre-bid conference will be held on January 15, 2026 at 2:30 PM at the project site. All companies intending to bid as a prime contractor, as well as major sub-contractors, are encouraged to have an employee of the company attend and identify themselves and the company on the sign-in sheet. Bid Due: Sealed Bids will be received up to 1:00 PM January 28, 2026 at the District Office, Fife Public Schools, located at 1720 Oak Street, Milton, WA 98354. Bids received after the date and time stated above will not receive consideration. Bid Opening: Bids will be publicly opened and read aloud immediately following the date and time indicated above for the receipt of bids. Subcontractor Listing Subcontractor listing is not required. Apprenticeship Apprenticeship participation in accordance with RCW 39.04.320 is not required. Prevailing Wage: It is the responsibility of the bidder to go online to the L&I web page https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/ to verify they have the most current prevailing wages at time of bid. Bid Bond: Accompany each Bid with a certified check, cashier's check, or surety company bid bond in an amount not less than 5 percent of the Base Bid. Make payable to Fife Public Schools. Bid Documents: Bid Documents for the project may be obtained, on or about January 6, 2026, from ARC Document Solutions 632 Broadway, Tacoma, WA 98402. Electronic copies of the Bidding Documents may be obtained via download from ARC's Public Planroom. Visit https://www.e-arc.com/location/tacoma/ and select "Enter Public Planroom" from the menus near the bottom of the page. Printed copies of the Bidding Documents are available directly from ARC for the cost of printing. Documents may be shipped with shipping purchased directly from ARC. A plan holder's list is also available. To be added to the plan holder's list, send an email to tacoma.bidservices@e-arc.com. Bid Documents may be viewed at the following locations: Builders Exchange of Washington, Everett, WA Olympia Plan Center, Olympia, WA Daily Journal of Commerce, Seattle, WA Minority Contractors/Pierce Co, Tacoma, WA Small Business Incubator, Tacoma, WA Southwest Washington Contractors Association, Vancouver, WA Dodge Data & Analytics, Portland, OR Right to Reject: The Owner reserves the right to reject any and all bids, to waive informalities and irregularities in the bidding, and to accept bids which are considered to be in the best interests of the Owner. Withdraw of Bid: Bidders may not withdraw bids after time set for the Bid Opening, unless Award of Contract is delayed for a period of exceeding 45 days. By Order of: Clint Parrish Director, Director of Facilities Fife Public Schools 1720 Oak Street Milton, WA 98354 IPL0302599 Jan 6,13 2026
Post Date: 01/06 12:00 AM
Refcode: #IPL0302599 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025