ClassifiedsMarketplace
Logo
  • Classifieds
  • Contact Us
  • Sign In
  • Register
  • Place Ad
    • Obituary
    • Legal
    • Recruitment
    • Classified
    • Celebration
    • Retail

  1. Home
  2. Legals
  3. Legals & Public Notices

REQUEST FOR PROPOSALS LEASE-LEASEBACK SERVICES INTRODUCTION The Pollock Pines Elementary School District ("District") is issuing a Request for Proposals ("RFP") from Lease-Leaseback ("LLB") entities prequalified to provide the District pre-construction and construction services for the Modernizations of the Pinewood ES and Sierra Ridge MS located at Sierra Ridge MS at 2700 Amber Trail, Pollock Pines, CA and Pinewood ES 6181 Pine Street, Pollock Pines, CA. Prequalification is required for this project. Prequalification packages are to be submitted to the District no later than December 29, 2025. This process is pursuant to the Lease-Leaseback provision of Education Code Section 17406. The RFP describes the Project, the required Scope of Work, the selection process, and the minimum information that must be included in the proposal. The award will be to the entity offering the best value to the District as defined in the RFP. The prequalification and RFP packages can be obtained from the District's District Representative, Innovative Construction Services, Inc. (ICS) – Meredith Collins, meredith@icscm.com. CRITICAL DATES November 24, 2025 – Advertise and RFQ available. Please email District Representative, Innovative Construction Services, Inc. (ICS) – Meredith Collins, meredith@icscm.com. December 9, 2025 at 10am – Mandatory Preproposal conference starting at Pinewood ES 6181 Pine Street, Pollock Pines, CA. We will meet at the Flagpole. 2nd location Sierra Ridge MS at 2700 Amber Trail, Pollock Pines, CA. December 16, 2025 by 10am – Deadline to submit questions via email to Meredith Collins, meredith@icscm.com. December 23, 2025 by 10am – If applicable, an addendum will be issued. December 29, 2025 – Deadline to submit prequalification applications. To obtain a copy of the pre-qualification please email ICS, meredith@icscm.com. January 13, 2026 by 10am – Proposals due January 22, 2026 – Interviews (if applicable)January 23, 2026 – District selection of successful LLB Entity February 10, 2026 – Board award of LLB instrument February 13, 2026 – Issue Notice to Proceed (Pre-Construction Services) PROJECT DESCRIPTION The Scope of Work for the Project includes but is not limited to: One (1) SOQ will be submitted by the Respondent for this RFP. This project will be awarded to one (1) Entity; however, contract documents and processes including but not limited to facilities and site lease agreements, preconstruction services, TBR development, insurances, bonds will, and construction administration be provided by site/project. The total estimated TBR for the Pinewood ES Modernization Project is $1,500,000 and for the Sierra Ridge MS Modernization Project is $2,500,000. Construction at each site is anticipated to consist of one (1) construction Increment from 7/1/2026 – 10/31/2026. Punchist Nov 2026. Post construction from 12/1/2026 – 11/30/2027. Each site has an overall scope goal pending budget and priorities for each site have been identified within the RFP. 1. The Pinewood Elementary School Modernization project aims to enhance accessibility, address critical infrastructure needs, and improve campus functionality through targeted renovations and site upgrades. 2. The Sierra Ridge Elementary School Modernization project is designed to improve accessibility, upgrade aging building components, and enhance site functionality to support long-term durability and instructional needs. 11/24, 12/1/25 CNS-3988733# THE SACRAMENTO BEE IPL0292664 Nov 24,Dec 1 2025
Post Date: 11/24 12:00 AM
Refcode: #IPL0292664 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025