WakeMed's Raleigh Main Campus is planning to construct new replacement boilers in accordance with North Carolina G.S. §143-215.108. This will include site preparation and grading prior to obtaining a modified permit from the North Carolina Division of Air Quality (NC-DAQ). The new natural gas boilers will feature low-NOx technology, ensuring that air emissions do not increase and that criteria pollutant levels remain below 100 tons per year (TPY).
Written comments regarding the proposed boiler upgrades can be submitted to the NC-DAQ at the following address:
Attention: DAQ Regional Supervisor
3800 Barrett Drive
Raleigh, NC 27609
WakeMed's address for correspondence is:
Attn: John Horton, WakeMed
3000 New Bern Ave.
Raleigh, NC 27610
Air Permit No.: 06849R09
Issued: June 9, 2023
Construction Period: April 2026 to October 2027