ClassifiedsMarketplace
Logo
  • Classifieds
  • Contact Us
  • Sign In
  • Register
  • Place Ad
    • Obituary
    • Legal
    • Recruitment
    • Classified
    • Celebration
    • Retail

  1. Home
  2. Legals
  3. Legals & Public Notices

NOTICE TO BIDDERS NEW BASEBALL FIELD ARTIFICIAL TURF AT PACHECO HIGH SCHOOL Los Banos Unified School District SECTION 00 1110 - INVITATION TO BID 1. NOTICE TO CONTRACTORS: The Los Banos Unified School District, acting by and through its Governing Board, hereinafter referred to as the Owner, will receive sealed bids for the award of contracts for the construction of the New Baseball Field Artificial Turf at Pacheco High School, 200 Ward Rd., Loas Banos, CA 93635. 2. SUBMITTAL OF BIDS: .1 Sealed Bids: Sealed envelopes containing bids with subcontractor's list and other required attachments will be accepted by Los Banos Unified School District at the FOT Department located at 646 W. Pacheco Blvd., Los Banos, California 93635 on Wednesday, May 20, 2026, before 2:00:00 pm PST on the clock designated by the Owner or its representative as the bid clock. .2 Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Los Banos Unified School District at its FOT Department located at 646 W.Pacheco Blvd. Los Banos, California 93635. .3 DVBE Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit the Prime Bidder Good Faith Effort Worksheet and Prime Bidder Certification of Disabled Veteran Business Enterprise Participation forms to the Los Banos Unified School District at its offices located at FOT Department located at 646 W. Pacheco Blvd., Los Banos, California 93635. 3. OPENING OF BIDS: Bids will be opened and read aloud after 2:00:00 pm PST May 20, 2026. 4. MANDATORY PRE-BID CONFERENCE: A pre-bid conference has been scheduled for April 29, 2026, at 10:00 am, at the project site, Pacheco High School, 200 Ward Rd., Los Banos, California, 93635, and will include the opportunity to inspect the site and may include dissemination of additional information in response to questions or otherwise. All bidders will be deemed to have notice of all conditions and information which bidders could have obtained by attending the pre-bid conference, including but not limited to any conditions in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon. Bids will not be accepted from bidders who did not attend the pre-bid conference. 5. DESCRIPTION OF WORK: The Work includes an alteration to an existing school campus located at Pacheco High School consisting of replacement of the baseball field with Artificial turf, and related on-site development. 6. BASIS FOR BIDS: Bids shall be on a lump sum basis. 7. TIME OF COMPLETION: The Work shall be completed within 90 calendar days from the date of the Owner's Notice to Proceed. 8. EXAMINATION AND PROCUREMENT OF CONTRACT DOCUMENTS: Contract Documents have been prepared by Mangini Associates Inc. Documents may be examined and obtained at the Architect's office, 4320 West Mineral King Avenue, Visalia, CA 93291, (559) 627-0530, Monday -Thursday between 8 am and 5 pm and Friday between 8 am and 12 pm or at Dodge Data & Analytics, ConstructConnect, Tulare-Kings County Builders Exchange (Visalia), the Central California Builders Exchange (Fresno), Kern County Builders Exchange (Bakersfield), Builders Exchange of Stockton. The architect's contact for questions or RFI's is Edgar Sanchez at edgar@mangini.us. Digital plan sets are available in .pdf format by contacting Bridgette Young at bridgette@mangini.us. Only bonafide general contract bidders may secure digital copies of the proposed Contract Documents from the Architect: .1 Only plan holders and the listed exchanges will be notified of Addenda. 9. SUBSTITUTIONS: Pursuant to California Public Contract Code Section 3400, contractors and material suppliers shall submit requests to the Architect, not less than 10 days prior to bid (if material is to be included on final addendum), all data substantiating a request for substitution of materials. In order to be considered, substitutions of materials or equipment must comply with the requirements of specification Section 01 2500, including providing comparative data and samples. 10. BID SECURITY: Submit bid security with proposal, made payable to Owner, in amount of 10% of the Bid, in the form of certified check, bid bond, cashier's check or cash. Bid security will be retained until Agreement is signed and required bonds furnished. If any bidder refuses to sign the Agreement Form within 7 days after Award, the Owner will retain his bid security as liquidated damages. To enable compliance with California Code of Civil Procedure Section 995.311, each contractor shall provide, prior to Contract Award, a print-out of information from the Department of Insurance website http://www.insurance.ca.gov/ confirming the surety is an admitted surety insurer. 11. QUALIFICATION OF BIDDER: The Owner will not consider or accept any bids from contractors or subcontractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code of the State of California, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the Contractor shall have a Class B license and shall maintain that license in good standing through Project completion and all applicable warranty periods. 12. AWARD: The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 60 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 60 days to make a decision regarding the rejection of bids or the award of the Contract. 13. PREVAILING WAGES: The Project is a public work and under California Labor Code Section 1770 et seq., the Director of the California Department of Industrial Relations ("DIR") has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the rates are on file at the Owner's principal office. It shall be mandatory upon the Contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this Agreement. 14. DIR REGISTRATION: The Owner will not accept any bid or enter into any contract without proof of the bidder's current registration to perform public work under Labor Code Section 1725.5. Bidders shall not accept any subbid or enter into any subcontract without proof of the subcontractor's current registration to perform public work under Labor Code Section 1725.5. 15. LABOR COMPLIANCE: Contractor and all subcontractors shall comply with Labor Code Section 1776. In accordance with Labor Code section 1771.4(a)(1), the Project is subject to compliance monitoring and enforcement by the DIR. The Contractor and each subcontractor shall furnish a certified copy of all payroll records directly to the Labor Commissioner on a monthly basis, unless directed by the Owner to furnish such records more often, and in the format prescribed by the Labor Commissioner. 16. RETENTION FUND: The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. 17. REQUIRED CERTIFICATIONS: Bids must be accompanied by the following forms, fully executed by each Bidder: .1 Non-Collusion Affidavit .2 Contractor's Certificate Regarding Workers Compensation .3 Fingerprinting Notice and Acknowledgment .4 Sufficient Funds Declaration .5 Acknowledgment regarding Drug Free Workplace .6 Acknowledgment regarding Alcoholic Beverage and Tobacco-Free Campus Policy .7 Acknowledgment regarding No Contracting with Sanctioned Entities .8 Prime Bidder Good Faith Effort Worksheet and Prime Bidder Certification of Disabled Veteran Business Enterprise Participation. 18. DSA OVERSIGHT PROCESS: The Contractor shall comply with the applicable requirements of the Division of State Architect ("DSA") Construction Oversight Process ("DSA Oversight Process"), including but not limited to (a) notifying the Project Inspector upon commencement and completion of each aspect of the work as required under DSA Form 156; (b) coordinating the Work with the Project Inspector's inspection duties and requirements; (c) submitting verified reports under DSA Form 6-C; and (d) coordinating with the Owner, Owner's Architect, any Construction Manager, any laboratories, and the Project Inspector to meet the DSA Oversight Process requirements without delay or added costs to the Project. 19. DVBE REQUIREMENTS: The Owner will require the successful Bidder to achieve the minimum goal of 3% DVBE (Disabled Veteran Business Enterprises) established in the bidding documents or to provide acceptable evidence of good faith efforts to do so. Dates April 22, 2026 BY ORDER OF THE BOARD OF TRUSTEES OF Advertised: April 29, 2026 LOS BANOS UNIFIED SCHOOL DISTRICT Anthony Parreira, President of the Board
Post Date: 04/22 12:00 AM
Refcode: #IPL0333042 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025