ClassifiedsMarketplace
Logo
  • Classifieds
  • Contact Us
  • Sign In
  • Register
  • Place Ad
    • Obituary
    • Legal
    • Recruitment
    • Classified
    • Celebration
    • Retail

  1. Home
  2. Legals
  3. Legals & Public Notices

NOTICE OF Request for Proposal (RFP) General Contractor/Construction Manager GC/CM- Victory Village (2026-RFP-18) Contact: Rebecca Kelley, Procurement Analyst E-Mail: rkelley@fresnohousing.org Fresno Housing (FH) is soliciting proposals from qualified General Contractor/Construction Manager (GC/CM) firms to provide preconstruction, comprehensive rehabilitation, and new construction services for the Victory Village project, located at 959 N. Partway Drive, Fresno, California 93728 (APN 449-324-11). Victory Village is an adaptive reuse development situated on an approximately 63,574-square-foot (1.46-acre) site. The project will transform an underutilized motel property into permanent, high-quality affordable housing through the rehabilitation and conversion of two existing motel buildings and the construction of a new community building. The completed development will include 42 residential units, consisting primarily of studio and one-bedroom apartments, as well as one three-bedroom manager's unit. The project is intended to improve building performance, accessibility, health and safety conditions, and long-term operational sustainability. The proposed development generally includes: • Adaptive reuse and comprehensive rehabilitation of two existing motel buildings; • Construction of a new community building; • Site, landscaping, parking, accessibility, and utility improvements; • Creation of 42 residential units, consisting of studio and one-bedroom apartments and one three-bedroom manager's unit; and • Compliance with all applicable local, state, and federal requirements, including requirements associated with the project's funding sources. Component Description Project Type Adaptive Reuse Multifamily Housing Development Location City of Fresno, California APN 449-324-11 Site Area 63,574 SF (±1.46 Acres) Residential Units 42 Total Units Construction Type Type V-B Existing Buildings Building 1 & Building 2 (Adaptive Reuse) New Construction Community Building Building Height One- and Two-Story Construction, up to 22 feet Parking 63 Parking Stalls EV Requirements California minimum EV-capable, EV-ready, and EV charger requirements This project is funded by the California Department of Housing and Community Development and other City and State funding sources. Accordingly, the project is subject to all applicable federal, state, and local requirements, including the Federal Davis-Bacon Act, California prevailing wage laws, and Build America, Buy America (BABA) requirements. The Contractor and all subcontractors must be registered with the California Department of Industrial Relations (DIR), as applicable, and must submit certified payroll records for work performed under the resulting contract. The project is subject to 5% retention and requires a bid bond or other acceptable bid guarantee, as well as payment and performance bonds. All proposals submitted in response to this solicitation must fully comply with the requirements and specifications set forth in this document and all incorporated attachments and addenda. How to Obtain Solicitation Documents: • Download from procurement portal: https://procurement.opengov.com/portal/fresnohousing • Click on "+ Subscribe" to access all current and future Fresno Housing solicitations • Sign up/Sign in. • Review and Download the RFP documents. Submittal Deadline: Friday, September 4, 2026 at 4:00PM PDT Disabled Veteran Business Enterprises (DVBE) and/or Minority and/or Women Owned Business Enterprises (MBE/WBE) are encouraged to respond. IPL0363364 Aug 7,14 2026
Post Date: 08/07 12:00 AM
Refcode: #IPL0363364 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025