RFB 38-26 Request for Bid for Settlers Park Phase 2 Project
The city is soliciting bids from qualified contractors for the SETTLERS PARK PHASE 2 PROJECT located north of Bass Pro Court and west of SH 26 on 22.9 acres of public land including a 6.2-acre lake. The project is receiving funding assistance through the Land and Water Conservation Fund, U.S. Department of the Interior, National Park Service, and administered by the Texas Parks & Wildlife Department. This project is subject to the Build America, Buy America Act (BABA). Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. The intent is to award a primary contract based on low bid that meets or exceeds specifications in accordance with the provisions of the current Texas Local Government Code Title 8.
Enhancements to include the installation of concrete drive, parking spaces, concrete trails, soft surface trails, dry stack stone retaining walls, kayak launch and floating docks, fishing pier, primitive camp sites, pavilion structures, site furnishings, trail lighting, and site utilities in a natural park setting with the intent to work with the existing natural resources and reasonably preserve existing natural conditions.
The RFB documents may be viewed and obtained by registering online through the City's eBid system found on the Grapevine Purchasing webpage: https://grapevinetexas.gov/111/Purchasing.
The RFB closing date and time is July 30, 2026, at 2:00 p.m. local time. RFB responses are due prior to the RFP closing date and time. Responses received after the above time will not be permitted. Submit your bid documents electronically through the eBid Procurement system and include all required document submittals.
RFB submittal results will be presented to the City Council at which time the City reserves the right to accept or reject any or all responses and to waive any informality in the RFB responses.
IPL0355929
Jul 9,16 2026