View original fileYou’re Invited to Participate! INFORMATIONAL MEETING
BROWN BOUELVARD SIDEWALK IMPROVEMENTS (N. COLLINS STREET TO HIDDEN RIDGE DRIVE)
PROJECT NO. PWSW23001
THURSDAY, APRIL 30, 2026 6 P.M. to 7 P.M.
George W. Hawkes Downtown Library [re] brary Room A & B 100 S. Center Street
Arlington, Texas 76010
The City of Arlington will begin construction in May 2026.
Improvements include installation of concrete sidewalks and ADA pedestrian ramps on Brown Boulevard from North Collins Street to approximately 150-ft east of Meandering Way, as well as the replacement of a culvert headwall along the sidewalk route adjacent to west-bound traffic flow, between Summer Creek Circle and Summer Creek Lake. Additionally, the existing roadway will be milled & overlayed with asphalt from North Collins Street to Hidden Ridge Drive.
The purpose of this meeting is to provide information and answer questions you may have concerning the proposed construction. There will be a short presentation followed by a question and answer session.
If you have questions but are unable to attend the meeting, please contact Zeph Israel, E.I.T., Graduate Engineer, with the Department of Public Works at 817-459-6552 or at Zephaniah.Israel@arlingtontx.gov.
Individuals wishing to attend are advised that this location is accessible to and usable by qualified individuals with disabilities. The City of Arlington will, generally, upon request, provide appropriate auxiliary aids and services leading to effective communication for qualified individuals with disabilities so they can participate equally in the meeting. Anyone requiring an auxiliary aid or service should contact the City of Arlington ADA Coordinator, 101 West Abram Street, Arlington, TX 76010, 817-459-6550, or ADACoordinator@ arlingtontx.gov as soon as possible, but not later than 72 hours prior to the scheduled meeting.