View original fileThe City of Arlington Public Works Department, in accordance with Nation- al Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City’s intent to revise the flood hazard information, generally located between east of South Cooper Street and Texas 360 Toll Road. Specifical- ly, the flood hazard information shall be revised along:
• Lynn Creek from just upstream of South State Highway 360 to just downstream of Saint Leonard Drive;
• Lynn Creek Tributary 1 from the confluence with Lynn Creek to 710 ft upstream of Silo Road;
• Lynn Creek Tributary 2 from the confluence with Lynn Creek to 970 ft upstream of West Lynn Creek Drive;
• Lynn Creek Tributary 3 from the confluence with Lynn Creek to approximately 1,140 ft upstream of West Sublett Road;
• Lynn Creek Tributary 4 from the confluence with Lynn Creek to just downstream of Eden Road.
As a result of the revision, the floodway shall widen or narrow or be es- tablished, the 1% annual chance water-surface elevations shall increase or decrease or be established, and the 1% annual chance floodplain shall widen or narrow or be established within the area of revision.
Maps and detailed analysis of the revision can be reviewed at the City of Arlington Public Works Department at 101 W. Abram Street, Arlington, TX 76010. Interested persons may call Lee Jeffrey, P.E. at 817-459-6550 for additional information during normal business hours.