RFQ#FAC2026-03 LEGAL NOTICE OF REQUEST FOR QUALIFICATIONS FOR
ARCHITECTURAL & ENGINEERING SERVICES
PUBLIC ANNOUNCEMENT FOLLOWING PROCEDURES OF THE CONSULTANT'S COMPETITIVE NEGOTIATION ACT, CHAPTER 287.055, LAWS OF FLORIDA
The District Board of Trustees of State College of Florida Manatee-Sarasota ("Board") announces Professional Design Services will be required by qualified Architects registered in the State of Florida to provide planning and design services, complete contract documents (plans and specifications), bid and proposal services, and construction administration for the following phased project:
Phase 1: Construct new Collegiate School buildings on the SCF Venice Campus. The project will consist of approximately 22,000 GSF of buildings and will include academic space, administration, cafeteria, auditorium, courtyard and a physical educational area. The project budget is $16 million and includes all project costs including soft costs, furniture, fixtures and equipment. The project schedule is dependent on the State College of Florida receiving the entire project's funding. The preliminary schedule assumes design starts in Spring 2026 and construction pricing received mid to late 2027.
Phase 2: Construct new Collegiate School buildings on the SCF Parrish Campus. The project will consist of approximately 22,000 GSF of buildings and will include academic space, administration, cafeteria, auditorium, courtyard and a physical educational area. The project budget is $16.9 million and includes all project costs including soft costs, furniture, fixtures and equipment. The project schedule is dependent on the State College of Florida receiving the entire project's funding. The preliminary schedule assumes design starts in Spring 2027 and construction pricing will be received mid to late 2028. The college intends to use the Venice Collegiate School design for the Parrish Collegiate School and adapt the design for the Parrish site conditions.
The college will be utilizing Construction Management (CM) at Risk for the Project Delivery Method. A single construction management firm will be selected through the CCNA process. As with the Architect, a single Construction Management (CM) firm will be used for both Phases, defined above.
The funding for Phase 1 and Phase 2 is separate. The college will hold a design contract with the Architect for Phase 1 and a separate design contract with the same Architect for Phase 2.
The college will hold a pre-construction services contract with the CM for Phase 1 and a separate pre-construction services contract with the same CM for Phase 2.
Upon receiving the entire project funding for Phase 1, the college will direct the CM to proceed with development of the Guaranteed Maximum Price. Similarly, upon the college receiving the entire project funding for Phase 2, the college will direct the CM to proceed with development of the Guaranteed Maximum Price. Separate construction contracts will be issued to the same CM for Phase 1 & Phase 2.
The college anticipates design fee cost savings by utilizing the same building design for both the Venice and Parrish Collegiates Schools. The college also anticipates construction efficiencies will be gained on the Parrish Collegiate School buildings by the CM. These construction efficiencies should have positive impacts on the construction quality, schedule and cost.
Applicants for the project must apply in writing for consideration. Interested architectural firms must submit the information required by the Request for Qualifications (RFQ) application packet which includes the firm's abilities with respect to the specific project requirements, a synopsis of the firms qualifications, past educational facility experience, resumes of key personnel, and a current Standard Federal Form 254 or 330 (whether or not a Form 254 is on file with State College of Florida, Manatee-Sarasota).
Applicants for the project must apply in writing for consideration. Interested architectural firms must submit the information required by the Request for Qualifications (RFQ) application packet which includes the firm's abilities with respect to the specific project requirements, a synopsis of the firm's qualifications, past educational facility experience and resumes of key personnel. Request For Qualifications for Architectural & Engineering Services, RFQ #FAC2026-03, may be viewed and downloaded from the college's VendorLink web page. Interested parties may receive additional information, or request a copy of the RFQ document, via email to: Jennifer Leal / lealj@scf.edu. Questions regarding this RFQ must be submitted no later than 5 days prior to the RFQ due date.
Return the printed and completed RFQ to Facilities Management at State College of Florida, Manatee - Sarasota, Attn: Chris Wellman, VP, Operations, 5840 26th Street West, Building 23, Bradenton, FL 34207, no later than 9:00 a.m., on November 14, 2025. No electronic submittals will be accepted. The College will not be responsible for any delays in delivery. Submit ten (10) original proposals including the Experience Questionnaire.
The Professional Services Recommendation Committee will meet at the Bradenton Campus in Building 7, Board Room 160, on Friday, December 12, 2025, at 9:00 a.m., to review and score the statements of qualifications received by the college.
No fewer than three (3) firms will then be requested to present and interview with the Professional Service Recommendation Committee on Friday, January 9, 2026, beginning at 9:00 a.m., at the Bradenton campus in Building 7, Board Room 160. Registered applicants, who submitted a completed RFQ, will be notified in writing of any changes to the above interview date at least five (5) days prior to the newly established interview date. Any addendum to the RFQ will be issued electronically to registered applicants.
Any response to the RFQ received after the specified time and date will be considered late and unopened. Any response to the RFQ submitted orally, via e-mail or facsimile, will not be accepted.
IPL0280786
Oct 12 2025