NOTICE TO BIDDERS
Merced County Office of Education
632 West 13th Street, Merced, CA 95341
NOTICE TO BIDDERS
REQUEST FOR SEALED BIDS
FOR MODULAR BUILDING CONTRACTORS
NOTICE IS HEREBY GIVEN that the Merced County Office
of Education, MCOE, (hereinafter the "District")
of Merced, CA, acting by and through its Governing
Board, will receive sealed bids no later than 1:30:00 pm,
on September 10, 2025, at the MCOE Maintenance & Operations
Office located at; 2100B Cooper Avenue, Merced, CA 95348
for the following project:
New Modular Special Ed Classroom Building (s) to be located at
Pioneer Elementary School in Merced, CA &
Lee Anderson Education Center in Atwater, CA
Fabricate, transport and install a 2,400 sf, mono-roof slope,
standing seam metal roofing, moment frame building, utilizing
a 15'x32.5' module. The building must have a DSA approved PC,
7 feet overhangs at the front of the building with 2' sidewall and rear
overhangs, Hollow metal doors and windows, tackboard
at interior classroom walls, FRL at restrooms and suspended
T-bar ceilings. Building must also have complete mechanical
HVAC system, electrical power & lighting and plumbing fixtures.
Note: Slab-on-grade & foundation, under slab plumbing, site utilities,
fire alarm system, casework, flooring, signage, window coverings, all site
improvements including site grading & drainage shall be completed by others.
The work shall be performed within the following
time frame: (150 days)
The official bid documents will be available on August 20, 2025,
and may be obtained at the office of SKW & Associates, 2237 Scenic Drive,
Modesto, CA (209) 523-8323, or from the website; skwassociates.com
A Mandatory Pre-bid Conference and site visit will be
held on August 27, 2025, at 10:00 am, at Pioneer Elementary
School, 2950 East Gerard Avenue, Merced, CA 95341
The District has determined the general prevailing rate to be the per
diem wages for each craft or type of workman or mechanic needed
to execute this contract as set forth in the collective bargaining agreements
for Stanislaus, San Joaquin, and Merced Counties, California.
COMPLIANCE MONITORING: This project is subject
to compliance monitoring and enforcement by the
Department of Industrial Relations, Office of the Labor
Commissioner. Copies of all collective bargaining
agreements relating to the work are on file and available
for inspection in the office of the California Department
of Industrial Relations, Division of the Labor Statistics
and Research, 455 Golden State Avenue, San Francisco,
CA 94102, (415-703-4780), <http:/www.dir.ca.gov/dlsr>
In compliance with SB 854, no Contractor or subcontractor
may be listed on a bid proposal for a public works project
unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under
Labor Code section 1771.1(a)].
In addition, no contractor or subcontractor may be awarded
a contract for public work on a public works project unless
registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5.
A valid Type B – Contractors License will be required.
Bids must be returned in a sealed envelope, identified
by the bid title "Pioneer ES & Lee Anderson Ed Center – New
Special Ed Buildings – in Merced & Atwater"
and bearing the name and address of the proposer.
The Board reserves the right to reject any and all Bids
and/or waive any irregularity in any bid received. Unless
otherwise required by law, no bidder may withdraw its
bid for ninety (90) days after the date of the bid opening.
Dr. Steve Tietjen – County Superintendent of Schools
Merced County Office of Education
Armando Campos
Director of Facilities & Support Services
Pub Dates: 8/17/25 & 8/24/25
IPL0263653
Aug 17,24 2025