ClassifiedsMarketplace
Logo
  • Classifieds
  • Sign In
  • Register

  1. Home
  2. Legals
  3. Legal Display

View original file
Application of Oncor Electric Delivery Company LLC to Amend Its Certificate of Convenience and Necessity for the Division 138 kV Transmission Line Project in Tarrant and Dallas Counties, Texas PUBLIC UTILITY COMMISSION OF TEXAS (PUC) DOCKET NO. 58453 This notice is to inform you that Oncor Electric Delivery Company LLC (“Oncor”) has applied to amend its certificate of convenience and necessity (“CCN”) to construct, own, and operate a new double-circuit 138 kilovolt (“kV”) transmission line. The proposed transmission line will begin at Oncor’s proposed Division Substation, to be located southwest of Division Street and Stadium Drive in Arlington, Texas. From there, the proposed transmission line will extend east to one of four southern intermediate tap point alternatives along Oncor’s existing Executive Parkway Switch–Sherry Switch 138 kV transmission line between the proposed Division Substation and State Highway (“SH”) 360. The proposed transmission line will then follow that existing transmission line corridor until it reaches a second, northern intermediate tap point located north of Division Street. From this northern tap point, the proposed transmission line will continue to the project’s eastern endpoint, which will be one of three potential tap locations along the existing Liggett Switch–Cedar Hill Switch 138 kV transmission line, located east of SH 360. The locations of the southern intermediate tap point and the eastern endpoint will be determined by the route selected by the Public Utility Commission of Texas (the “Commission” or “PUC”). The length of the project is approximately 3.39 to 5.80 miles, with an estimated total project cost ranging from approximately $82,096,000 to $123,270,000 (including station costs), depending on the route ultimately selected by the Commission. If you have questions about this project, you may contact Jeremy McConnell of Oncor at (214) 486-5216. A detailed routing map may be reviewed at the following location: Display Location Address Arlington City Hall 101 W. Abram St., Arlington, TX 76010 All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas. The preferred method for you to file your request for intervention is electronically. If you decide to file a request for intervention electronically, you will be required to serve the request on all other parties by email. Therefore, please include your own email address on the intervention form. Instructions for electronic filing via the “PUC Filer” on the PUC’s website can be found here: https://interchange.puc.texas.gov/filer. Instructions for using the PUC Filer are available at: https://ftp.puc.texas.gov/public/puct-info/industry/filings/E-Filing_Instructions.pdf. For assistance with your electronic filing, please contact the PUC’s Help Desk at (512) 936-7100 or helpdesk@puc.texas.gov. You can review materials filed in this docket on the PUC Interchange at: http://interchange.puc.texas.gov. While the preferred method for submitting a request for intervention is electronically, you may file your request for intervention by mailing a hard copy of your request to the PUC. Any request must be received by the intervention deadline of September 8, 2025. If you are not filing your request for intervention electronically, mail the request for intervention and 10 copies of the request to: Public Utility Commission of Texas Central Records Attn: Filing Clerk 1701 N. Congress Avenue P.O. Box 13326 Austin, Texas 78711-3326 Persons who wish to intervene in the docket must also email or mail a copy of their request for intervention to all parties in the docket and all persons that have pending motions to intervene, at or before the time the request for intervention is electronically filed with, or mailed to, the PUC. The only way to fully participate in this proceeding is to intervene in this docket. It is important for an affected person to intervene because the utility is not obligated to keep affected persons informed of the PUC’s proceedings and cannot predict which route may or may not be approved by the PUC. The deadline for intervention in the docket is September 8, 2025, and the PUC must receive your request to intervene by that date if you choose to do so. The PUC has a brochure titled “Landowners and Transmission Line Cases at the PUC.” Copies of the brochure may be requested by contacting Jeremy McConnell of Oncor at (214) 486-5216 or may be downloaded from the PUC’s website at www.puc.state.tx.us. To obtain additional information about this docket, you may contact the PUC’s Customer Assistance Hotline at (512) 936-7120 or (888) 782-8477. Hearing- and speech-impaired individuals may contact the Commission through Relay Texas at 1-800-735-2989. In addition to the intervention deadline, other important deadlines may exist that affect your participation in this docket. As such, you should review the orders and other filings made in the docket. LINK COMPOSITION OF ALTERNATIVE FILED ROUTES DIVISION 138 KV TRANSMISSION LINE PROJECT Route Link Sequence Total Length (miles) 1 A1-A3-B8-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H4-K2-K7-Z1 4.43 3 A1-A2-B2-C7-C9-D1-D3-D6-D8-E1-E5-E8-F7-F8-F5-F3-F4-I1-I2-L1-K7-Z1 4.05 7 A1-A2-B2-C7-C9-D2-D4-D6-D8-E2-E6-E8-F7-F8-F9-I5-I6-I7-L3-L2-L1-K7-Z1 4.26 33 A1-A2-B1-C2-C5-C8-C9-D2-D5-D7-D8-E1-E5-E8-F7-F8-F9-I5-I6-I7-L3-L2-L1-K7-Z1 4.46 37 A1-A2-B1-C2-C5-C8-C9-D2-D5-D7-D8-E1-E5-E8-F7-F8-F5-F3-F4-H1-H2-H3-K9-Z1 4.55 41 A1-A2-B1-C2-C5-C6-C7-C9-D1-D3-D6-D8-E2-E6-E8-F7-F8-F5-F3-F4-I1-I2-L1-K7-Z1 4.25 43 A1-A2-B1-C2-C3-C4-D3-D6-D8-E2-E6-E8-E9-F2-F3-F4-I1-I2-L1-K7-Z1 4.37 47 A1-A2-B1-C1-C4-D3-D6-D8-E2-E6-E8-E9-F2-F3-F4-I1-I2-L1-K7-Z1 4.38 129 A1-A3-B8-D7-D8-E1-E3-E7-F2-F3-F4-I1-I3-M1-M6-Z2 4.19 137 A1-A2-B2-C7-C9-D2-D5-D7-D8-E1-E5-E8-F7-F8-F5-F3-F4-I1-I3-M1-M6-Z2 3.80 138 A1-A2-B2-C7-C9-D2-D5-D7-D8-E1-E3-E7-F2-F3-F4-I1-I3-M2-M5-M6-Z2 3.58 140 A1-A2-B1-C2-C5-C8-C9-D1-D3-D6-D8-E2-E6-E8-F7-F8-F9-I5-I6-I7-M3-M7-Z2 3.96 150 A1-A2-B1-C1-C4-D3-D6-D8-E2-E6-E8-E9-F2-F3-F4-I1-I3-M1-M6-Z2 4.14 190 A1-A2-B2-C7-C9-D1-D3-D6-D8-E2-E6-E8-F7-F8-F9-I5-J1-J2-J3-J6-J7-J8-J9-L5-O3-O4-P2-P3-R3-R7-Z3 4.89 192 A1-A2-B2-C7-C9-D1-D3-D6-D8-E2-E6-E8-F7-G1-G4-G7-G9-J6-J7-J8-J9-L5-O3-O4-P2-P3-R3-R7-Z3 5.06 195 A1-A2-B2-C7-C9-D2-D4-D6-D8-E1-E3-E7-F2-F3-F4-I1-I4-I7-L4-L5-O3-O4-P2-P3-R3-R7-Z3 5.11 205 A1-A2-B1-C1-C4-D3-D6-D8-E2-E6-E8-F7-F8-G2-G5-G8-G9-J6-J7-J8-J9-L5-O3-O4-P2-P3-R3-R7-Z3 5.42 210 A1-A2-B1-C1-C4-D3-D6-D8-E1-E5-E8-F7-F8-F5-F3-F4-I1-I3-L3-L4-L5-O3-O4-P2-P3-R3-R7-Z3 5.80 214 A4-B4-B5-B6-D4-D6-D8-E2-E6-E8-F7-F8-F5-F3-F4-I1-I2-L1-K7-Z1 3.85 230 A4-B4-B7-B8-D7-D8-E2-E6-E8-F7-F8-F9-I5-I6-I7-L3-L2-L1-K7-Z1 4.01 264 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-H1-H2-H4-K2-K3-K5-K8-K9-Z1 4.01 265 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-H1-H2-H4-K2-K3-K4-K6-K8-K9-Z1 4.01 267 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-H1-H2-H4-K1-K4-K6-K8-K9-Z1 4.00 268 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-H1-H2-H3-K9-Z1 4.02 271 A4-B4-B7-B8-D7-D8-E1-E5-E8-F7-F8-F9-I5-I6-I7-L3-L2-L1-K3-K4-K6-K8-K9-Z1 4.34 284 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F4-I1-I2-L1-K7-Z1 3.61 290 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H4-K2-K7-Z1 3.61 291 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H4-K2-K3-K5-K8-K9-Z1 3.92 295 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H3-K9-Z1 3.93 305 A4-B3-B6-D4-D6-D8-E1-E5-E8-F7-F8-F5-F3-F4-H1-H2-H4-K2-K7-Z1 3.83 309 A4-B3-B6-D5-D7-D8-E2-E6-E8-E9-F2-F3-F4-I1-I2-L1-K7-Z1 3.72 312 A4-B3-B6-D5-D7-D8-E1-E5-E8-E9-F2-F3-F4-I1-I2-L1-K7-Z1 3.73 313 A4-B3-B6-D5-D7-D8-E1-E5-E8-F7-F8-F5-F3-F4-I1-I2-L1-K7-Z1 3.83 316 A4-B3-B6-D5-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H4-K2-K7-Z1 3.64 317 A4-B3-B6-D5-D7-D8-E1-F1-H2-H4-K2-K7-Z1 3.66 337 A4-B4-B7-B8-D7-D8-E2-E6-E8-F7-F8-F9-I5-I6-I7-M3-M7-Z2 3.52 338 A4-B4-B7-B8-D7-D8-E2-E6-E8-F7-F8-F9-I5-I6-I7-M3-M4-M5-M6-Z2 3.50 387 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-I1-I3-M1-M6-Z2 3.46 388 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-I1-I3-L3-M3-M7-Z2 3.83 391 A4-B4-B7-B8-D7-D8-E1-E5-E8-E9-F2-F3-F4-H1-H2-H4-K2-L1-L2-M1-M6-Z2 3.85 397 A4-B4-B7-B8-D7-D8-E1-E5-E8-F7-F8-F9-I5-I6-I7-M3-M7-Z2 3.53 398 A4-B4-B7-B8-D7-D8-E1-E5-E8-F7-F8-F9-I5-I6-I7-M3-M4-M5-M6-Z2 3.52 418 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F6-I5-I6-I7-M3-M4-M5-M6-Z2 3.66 434 A4-B4-B7-B8-D7-D8-E1-E3-E7-F2-F3-F4-H1-H2-H4-K2-L1-L2-M2-M5-M6-Z2 3.72 440 A4-B4-B7-B8-D7-D8-E1-F1-H2-H4-K2-L1-L2-L3-M3-M7-Z2 4.15 443 A4-B3-B6-D4-D6-D8-E2-E6-E8-F7-F8-F5-F3-F4-I1-I2-L2-M1-M6-Z2 3.69 445 A4-B3-B6-D4-D6-D8-E1-E5-E8-F7-F8-F9-I5-I6-I7-L3-M1-M6-Z2 3.74
Post Date: 08/13 12:00 AM
Refcode: #IPL0262419 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025