ClassifiedsMarketplace
Logo
  • Classifieds
  • Sign In
  • Register

  1. Home
  2. Legals
  3. Legals & Public Notices

Public Notice Barrier Island Marine Contractors, LLC has applied to the South Carolina Department of Environmental Services Bureau of Coastal Management for a permit to remove and replace the existing bulkhead with a new 4'-5'x 167' bulkhead. The proposed bulkhead will be placed in the same location as the existing structure. To replenish a 5' high by 167' long portion of the existing 184' rock revetment at a 3:1 slope. To remove the exisitng 12'x12' dock. The purpose of the proposed project is for erosion control at 2 Water Street located in the Huger Cove along the May River. Comments will be received by the Office of SCDES BCM at 1911 Boundary Street, Suite 104, Beaufort, SC 29902 by August 11, 2025.
Post Date: 07/25 12:00 AM
Refcode: #IPL0257057 
Print
  • COPYRIGHT
  • PRIVACY POLICY
  • TERMS OF SERVICE
iPublish® Marketplace powered by iPublish® Media Solutions © Copyright 2025