Public Notice
Barrier Island Marine Contractors, LLC has applied to the South Carolina Department of Environmental Services Bureau of Coastal Management for a permit to remove and reconstruct a private use dock. The reconstructed dock with consist of a 4'x160' walkway with handrails leading to a 20'x25' fixed pierhead. A 16'x16' portion of the pierhead will be covered by a roof. Channel-ward of the fixed pierhead, there will be a 3'x25' ramp leading to a 10'x40' floating dock. On the flood side of the floating dock, there will be a 12'x12' boatlift. The purpose of the proposed project is for private, recreational use at 113 Bridge Street located on the May Rivers. Comments will be received by the Office of SCDES BCM at 1911 Boundary Street, Suite 104, Beaufort, SC 29902 by August 11,2025.
IPL0257054
Jul 25 2025